The deed must now say one of three things: the title exists and is shown, the seller says it exists but does not show it, or the seller says there is none. Selling without a title is still allowed, but the buyer will know, and banks normally want the licence or the document that replaces it before approving a mortgage. Sort it out before you list the property, not after a buyer's lawyer finds it.
Ask for the title before you sign the promissory contract (CPCV), and check that the house as built matches what was approved. Extensions, pools, annexes and converted garages are where the two most often differ. If they do, the cost and time of putting it right is something to negotiate before you commit.
Your works director signs a statement that the build is complete and matches the approved plans, and the communication is filed. Problems start when the house differs from the plans, or when the works director has left the job, for example after a builder walks off site.
For our build management clients, the communication is included at handover.
We do not give legal advice; that stays with your lawyer. Statements are signed by licensed professionals in our network, and any legalisation works are quoted separately.
Since 1 October 2026 the law reads any reference to it as a reference to the new prior communication. In practice you need proof of that communication, or the licence issued before the change.
No. The new law does not ask you to reapply for a licence already issued; that is the title you show at the deed. What is worth checking is that the house as built still matches what was licensed.
After licensed works, immediately on filing. Otherwise, after 10 days; if the câmara orders an inspection, it takes place within 15 days of that decision. In practice the slow part is gathering the documents and signed statements, especially when the house does not match the plans.
Buildings from before the 1951 building regulations can be exempt. The câmara issues an exemption certificate, which notaries and banks usually ask for. The cut-off date can vary by council, and later works such as extensions bring the property back under control.
From €350 for the review and written report. If you want us to see it through, tracking costs from €300 a month.
Start the Conversation
Whether you have a plot, an architect, or just a vision — we'd love to hear about it. We'll come back to you within 24 hours.